1If you have questions, call 800.GE.CARES or visit our website at: www.monogram.comInstallationInstructions42" IslandVent HoodModel:ZV1050
10Installation InstructionsSTEP 2 REMOVE THE PACKAGINGThe vent hood is packed separately from thedecorative duct cover or accessory covers ZX1059SFSS
11STEP 4 MOUNT TEMPLATE•Align the template with the marks on the ceiling andtape in place.– Be sure the template is oriented correctly, with thefront
12Installation InstructionsSTEP 6 SECURE WIRING•Route house wiring through the ceiling hole andpull a length to reach the hood junction box,approxima
13Installation InstructionsSTEP 8 INSTALL DECORATIVE DUCT COVERS•Pretap or drive decorative screw into the screwholes on the support frame. This will
14Installation InstructionsSTEP 10 CONNECT ELECTRICALVerify that power is turned off at the source.WARNING: If house wiring is not 2-wirewith a ground
15Installation InstructionsSTEP 12 INSTALL FILTERS, FINALIZE INSTALLATION•Remove protective film on the filters.•Tip the filter into the lower slots a
16Note: While performing installations described in this book,safety glasses or goggles should be worn.For Monogram® local service in your area, call1
2Design InformationWARNING:TO REDUCE THE RISK OF FIRE, ELECTRICALSHOCK OR INJURY TO PERSONS, OBSERVE THEFOLLOWING:A. Use this unit only in the manner
3Design InformationPRODUCT DIMENSIONSThis vent hood is designed to be used in vented ceilingmounted installations. It can be installed over anyMonogra
4ZV1050 Duct Cover Dimensions A BZV1050 11-1/2" 12"ZX1059 19" 20
5Advance PlanningTOOLS AND MATERIALS REQUIRED(not supplied)• Tape measure• Knife• Spirit level• Wire cutter• Wire stripper• Wire nuts• Electric drill
6Advance PlanningDUCT FITTINGSTotalEquivalent Quantity EquivalentDuct Piece Dimensions Length* Used LengthRound, 1 ft.straight (per footlength)1 ft.3-
7Installation InstructionsSTEP 1 CONSTRUCT CEILING SUPPORTPlan the locationDetermine the exact location of the vent hood.•Use a plumb bob to check lo
8Installation InstructionsSTEP 1 CONSTRUCT CEILING SUPPORT (cont.)Align Duct toCenter of CooktopCooktopOutlineTop View—Ceiling Joists Run Perpendicul
9Installation InstructionsSTEP 1 CONTINUED• Arrange cross framing in the ceiling to suit theexisting structure. See examples.– Secure each 2 x 4 block
Comments to this Manuals