GE Monogram®InstallationInstructions36" IslandVent HoodModelZV850kitchen accessoriesU N L I M I T E Dran
10Installation36" Island Vent HoodWiring• Route house wiring through the ceiling holeand pull a length to reach the hood junctionbox, approximate
Installation36" Island Vent HoodInstallDecorativeDuct CoversStep811•Pretap or drive decorative screw into thescrew holes on the support frame. Th
12Installation36" Island Vent Hood10StepConnectElectricalVerify that power is turned off at the source.CAUTIONIf house wiring is not 2-wire with
13Installation36" Island Vent HoodSlide DuctCover Down,Install SideUtility BarsStep11• Hold the decorative duct cover and removethe temporary sto
14Installation36" Island Vent Hood• Remove protective film on filters.• Tip the filter into the lower slots at the rearof the opening. Lift the f
2Before you begin — Read these instructions completely and carefully.IMPORTANT - Save these instructions for local inspector’s use.IMPORTANT - OBSERVE
3Design Information36" Island Vent HoodModelZV850ModelAvailableRequiredAccessoryThis vent hood is designed to be used invented ceiling mounted in
4Installation Preparation36" Island Vent Hood• Tape measure• Knife• Spirit level• Wire cutter• Wire stripper• Wire nuts• Electric drill and 5/32”
5Installation Preparation36" Island Vent HoodDuctfittingsTotalEquivalent Quantity EquivalentDuct Piece Dimensions Length* Used LengthRound, 1 ft.
6Installation Preparation36" Island Vent HoodAdvancePlanning1StepNote: The cross framingmust be spaced 8-3/4” onthe side from centerline tocent
7Installation Preparation36" Island Vent HoodAdvancePlanning(continued)1StepDuctwork• Use the shortest and straightest duct routepossible. For sa
8Installation36" Island Vent HoodCheckInstallationHardware3StepCheck contents of the requiredaccessory, ZX858, ZX859 or ZX8510.Locate the hardwar
9Installation36" Island Vent Hood• Align the template with the marks on theceiling and tape in place.– Be sure the template is oriented correctly
Comments to this Manuals